Industry Updates


RECENT/UPCOMING PRICE INCREASES

Furniture

American Leather: April 7, 2026

Brown Jordan: April 20, 2026

Canadel: December 3, 2025

Century: January 2, 2026

Dedon: May 1, 2026

Designmaster: December 22, 2025

Gloster: May 1, 2026

Hancock & Moore: December 15, 2025

Hickory Chair:  July 6, 2026

Jessica Charles: December 15, 2025

John Richard: December 1, 2025

Lee Industries: February 16, 2026

Maitland Smith:  January 5, 2026

Palecek:  July 1, 2026

Sherrill Brands:  January 1, 2026

Taylor King: July 31, 2026

Visual Comfort: April 3, 2026

 

Rugs

Stark: September 2, 2025

 

Fabrics & Wall coverings

Glant: January 5, 2026

Fabricut Distributed Brands (The Vale, Jean Monro, Liberty of London): June 1 price increase

 

Window Treatments

Hartmann & Forbes
Price List – April 2025

Alta
Banded Shades
Reference Guide & Price List – Effective June 24, 2024
Last revised: 2-24-25

Wood & Faux Wood Blinds
Reference Guide & Price List – Effective May 13, 2025

Honeycomb Shades
Reference Guide & Price List – Effective September 16, 2024
Last revised: 5-13-25

Natural Woven Shades
Reference Guide & Price List – Effective March 18, 2024
Last Revised: 7-15-24

Roller Shades
Reference Guide & Price List – Effective July 22, 2024
Last revised: 3-1-25

Sheer Shadings
Reference Guide & Price List – Effective May 13, 2025

Select Metal
Wholesale Price effective Nov 1, 2022

Select Wood
Wholesale Price effective Nov 1, 2022

Kirsch

April 1 price increase

Custom Rodding & Basic Hardware
Wholesale Price effective 2025

Designer Metals
Wholesale Price effective 2025

Wood Trends
Wholesale Price effective 2025

Wrought Iron
Wholesale Price effective 2025

Paris Texas
Retail Price List & Product Guide effective June 2, 2025

The Finial Co
Retail Price List effective June 2, 2025

Orion Iron Art
Retail Price List effective March 15, 2025

Orion Design Art
Retail price list effective 2015


CURRENT VENDOR TARIFFS & SURCHARGES 

Fabrics & Wall coverings

Cowtan & Tout: 6% Surcharge 

Glant: 5% Surcharge  

Romo: 5% Surcharge (Applies to products from countries with up to 20% U.S. tariffs, including the EU, UK, and Turkey)

10% Surcharge (Applies to select products from regions with tariffs over 20%, including India and the Far East)

Zimmer + Rohde: 8% Surcharge 

 

Rugs

New Moon: 5% Surcharge (all made-to-order products and any in-stock items received after the tariff implementation date)

Stark: 50% Surcharge (only on shipments from India)

Tamarian: 20% Surcharge (only on shipments from India)

Tufenkian: 5% Surcharge

 

Furniture

Canadel: 25% Surcharge (Upholstered Items Only) + 3.5% Fuel/Foam Surcharge

Huppé: 25% Surcharge on Upholstery Items

Lloyd Flanders:  10% Surcharge (only applied to “other materials” collections)

Treasure Garden: 12% Surcharge 

Woodbridge: 8% Surcharge 

 
ALL OTHER FURNITURE LINES: A variety of surcharges have recently been implemented by our vendors to help offset a portion of the freight, fuel, and material cost increases being experienced across the industry. Please know that KDR continues to absorb additional costs wherever possible, but we have been forced to make the difficult decision to implement a 3.5% Fuel & Foam Surcharge on all furniture orders until further notice. Any tariffs that our vendors have in place (listed here) will still be separately charged. This will not apply to items that ship UPS/Fedex (Wall Art, Accessories, Lighting, or Furniture Fabric By The Yard). We recommend continued monitoring of this website for additional information on upcoming/current price increases, other surcharges and all tariff info, as well as lead times. Please call us any time for further details. 
 

Window Treatments 

Kirsch: 25% Surcharge (steel and aluminum products)

Orion: 15% Surcharge 

Select Drapery Hardware: 10% Surcharge (Traverse Rods, Metal Hardware, & Wood Hardware)


LEAD TIMES 

Furniture

AMERICAN LEATHER
Upholstery: 4-6 weeks
Comfort sleepers: 4-6 weeks

BAKER
Upholstery (fabric and frames in-stock): 8 weeks
Bespoke in Motion: 8-10 weeks
Bespoke upholstery: 8-9 weeks
McGuire upholstery: 4 weeks
Casegoods (in-stock): 2 weeks
Casegoods (finish-to-order): 6-8 weeks
Special Construction Case/Upholstery: 20-26 weeks


CENTURY
Cornerstone, Leatherstone, Tori: 10-12 weeks
Cornerstone Motion: 12-14 weeks
Leather: 10-12 weeks
Outdoor (Non Fully Upholstered): 4-6 weeks
Outdoor (Fully Upholstered): 10-12 weeks
Elegance, Studio Essentials, Great Room: 10-12 weeks
Century Chair/Dining Chairs: 10-12 weeks
Signature, Essex, Bench by the Inch: 10-12 weeks
Upholstered beds: 10-12 weeks
Stocked Case: 2-4 weeks
Finished in-stock product: 2-4 weeks (check with KDR sales associate for in-stock product)
Choose your finish case: 10-12 weeks
Details Custom Programs: 12-14 weeks
Special Construction Case/Upholstery: 18-24 weeks


CTH SHERRILL OCCASIONAL
Casegoods and occasional: 10-12 weeks

FABRICUT
Upholstery: 8-10 weeks

HANCOCK & MOORE
Stationary fabric: 10-12 weeks
Stationary leather: 8-10 weeks
Motion: 10-12 weeks

HICKORY CHAIR
Casegoods “stocked”: 2-3 weeks 
M2M casegoods: 8-10 weeks
Tufted upholstery: 8-10 weeks
Casegoods requiring finish: 8-10 weeks
“Special Construction” case: 17-19 weeks
Silhouettes: 8-10 weeks
Exposed wood upholstery: 8-10 weeks
Standard upholstery: 8-10 weeks
Beds: 10-12 weeks 
M2M upholstery: 10-12 weeks
“Special Construction” upholstery: 12-14 weeks
Dining chairs: 8-10 weeks
Outdoor: 4-6 weeks


HICKORY WHITE
Upholstery: 8-10 weeks
Casegoods: 10-12 weeks

JESSICA CHARLES
 6-10 weeks

LEE INDUSTRIES
Upholstery: 6-8 weeks
Special Construction Upholstery: 18-20 weeks

LEXINGTON
Upholstery: 6-8 weeks
Dining Chairs/casegoods with custom fabric: 4-6 weeks
Casegoods as shown: 1-2 weeks

LILLIAN AUGUST 
Upholstery (fabric and frames in-stock): 8-10 weeks
Casegoods & Occasional: 10-12 weeks
Finished in-stock product: 2-3 weeks (check with KDR sales associate for in-stock product)

MAITLAND SMITH
Occasional and accents: 1-2 weeks

MOTIONCRAFT
Upholstery: 8-10 weeks

MR. & MRS. HOWARD
Upholstery (fabric and frames in-stock): 8-10 weeks
Casegoods: 10-12 weeks

PRECEDENT
Upholstery (in-stock fabric): 8-10 weeks

SHERRILL
Upholstery (fabric and frames in-stock): 8-10 weeks

TAYLOR KING
Upholstery: 10 weeks

THAYER COGGIN
Upholstery: 8 weeks
Casegoods: 6-8 weeks
Special Construction Upholstery: 16-18 weeks

WHITTEMORE-SHERRILL
Upholstery: 8-10 weeks